
The concrete coated pipes for the construction of the Nord Stream Pipeline weighing about 25 tonnes each are transported by a reach stacker to the stockyard at Kotka (Finland).
Reference(s) for the image and text, is owned by Nord Stream AG
Submenu |
Submenu |
Submenu |
| safety | documents | materials |
| societies | pipes | flanges |
| fittings | valves | equipment |
| bolts | gaskets | fabrication |
| welding | N D T | specials |
| steel | steam | civil |
| dimensions | others |